Low-E Double Glazing Hinged Door(Toughened) With Smart Lock
INTERIOR DECORATION
Interior Wall
WPC (Wood Plastic Composite )
Floor
SPC (Stone Plastic Composite)
Bathroom+Plumbing
Bathroom Pod +Plumbing
Lighting
LED Lighting System
Electrical
Electrical System
Curtain Rail
Only curtain rail, curtain is not included
Customer Reviews
Production Process And Details
Transportation
Real Product Photos
FAQ
Q
How to make the payment?
A: T/T and letter of credit are acceptable, and we will be even more grateful to T/T. 30% deposit before production and 70% balance before T/T loading.
Q
What is the delivery time?
A: This depends on the order quantity. Generally speaking, the delivery time will be within 15 to 30 days.
Q
How to ship?
A: Ocean container loading.
Q
How to install it?
A: We will provide you with installation instructions and videos, and if necessary, we will send technical personnel to assist you. However, visa fees, airfare, accommodation, and wages will be provided by the buyer.
Q
How do you ensure the quality of the product?
A: Strict product quality control enables quality to achieve the future. This is the purpose of our factory. Every product in our factory has strict testing procedures and must achieve 100% quality before delivery.
Q
Is it difficult to assemble the room?
A: Not at all. As long as you can use electric tools, you can build a house independently according to the construction drawings.